Do machines already sold have to be redone?No. The regulation covers machinery placed on the market from 20 January 2027. Machines already placed remain under the rules in force at that time, unless a substantial modification makes them new machines.
My technical file is good under the Machinery Directive. Is that enough?It is a strong starting point but not sufficient: the required structure changes and there are new requirements, particularly on safety software and cybersecurity. The Check measures the distance between what you have and what is needed.
Is the €1,900 lost if I then order the rebuild?No. If you proceed with the rebuild within 60 days of the report, the €1,900 is credited against the quote. The report remains yours either way, usable with any provider.
Who signs the risk assessment?A partner engineer, under their own professional liability and insurance. We do not sign risk assessments: we handle the technical file, declaration, instructions and retention. That line is written into our terms.
Do you sign the declaration?No, and nobody can do that for you. The EU declaration of conformity is signed by the manufacturer or their authorised representative, who remains responsible. We prepare the documentation that supports it.
We are outside the EU. Does this apply to us?Yes, if your machines are placed on the EU market. Non-EU manufacturers have the same obligations and generally need an authorised representative established in the Union. We work in English throughout for this reason.
Data collection and document tooling. Not legal advice. The declaration is signed by the manufacturer's legal representative, who remains responsible for it.